• Considerate Constructors Award for Team Humber
  • Considerate Constructors Award for Team Humber

Considerate Constructors Award for Team Humber

27 March 2019

On Wednesday 27 March, the 2019 Silver Considerate Constructors Award was presented to 'Team Humber'. The team includes the members of the joint venture formed by A.Hak, Skanska and PORR, who are working together on the River Humber Gas Pipeline Replacement Project.

The award is a great achievement for all involved, as the jury report clearly showed: ‘This site has demonstrated an outstanding commitment to improving the image of construction, achieving exemplary standards in all areas of the Code of Considerate Practice. The award-winning project is a credit to Humber Pipeline Tunnel Joint Venture and to the site team involved.’

The joint venture has previously received high marks from the Considerate Constructors Scheme (CCS), an independent non-profit organisation set up in 1997 by the construction industry to improve its image.

Joint venture partners A.Hak, Skanska and PORR construct a 5.4 km long tunnel under the river Humber. An important project for their client National Grid. Annually, some 20 per cent of the national gas volume of the United Kingdom will pass through the tunnel under the river estuary at the English East Coast.

  • news

    Pipeline construction in France Pipeline construction in France

    Pipeline construction in France

    GRTgaz has been a valued French client of A.Hak for many years. Two recent projects, Arc de Dierrey and Val de Saône, have been portrayed in an impressive way.

  • projects

    aQuaintance aQuaintance

    aQuaintance

    aQuaintance, a new company of A.Hak Leidingbouw, Tebodin and Cofely, has signed a five year contract for the engereering, procurement and implementation of all national onshore projects for NAM.

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.

  • news

    Privacy Statement updated Privacy Statement updated

    Privacy Statement updated

    With effect from 1 April 2018, A.Hak applies a new Privacy Statement that is in accordance with the General Data Protection Regulation (GDPR).