• Outstanding result in KSA

Outstanding result in KSA

5 April 2018

In Saudi Arabia, A.Hak has constructed a 75-kilometer long 48-inch pipeline for Saudi Aramco. The pipleine transports seawater to the Khurais oil field where it is injected into the soil to facilitate oil production.

The Khurais Seawater Pipeline Project was successfully completed and provided us with a very positive 'good work declaration'. The General Manager of Saudi Aramco's Upstream Project Management speaks in a written statement of an outstanding contribution to the project.

In an earlier phase of the project, there was already a lot of appreciation for strict compliance with the safety rules. Then we reported that a million man hours had been made without a single incident resulting in loss of time (LTI).

  • news

    Pipeline construction in France Pipeline construction in France

    Pipeline construction in France

    GRTgaz has been a valued French client of A.Hak for many years. Two recent projects, Arc de Dierrey and Val de Saône, have been portrayed in an impressive way.

  • news

    Drone images River Humber Gas Pipeline Replacement Project Drone images River Humber Gas Pipeline Replacement Project

    Drone images River Humber Gas Pipeline Replacement Project

    Watch the site of the River Humber Gas Pipeline Replacement Project from above.

  • news

    Privacy Statement updated Privacy Statement updated

    Privacy Statement updated

    With effect from 1 April 2018, A.Hak applies a new Privacy Statement that is in accordance with the General Data Protection Regulation (GDPR).

  • projects

    Heat transfer pipeline under water Heat transfer pipeline under water

    Heat transfer pipeline under water

    Several A-Hak companies have contributed to the realization of a double heat transport pipeline. The pipeline makes it possible to use waste heat from two plants in the heating of a residential area.