• Activities

Core activities

A.Hak's core activities revolve around the construction of underground infrastructure - and associated above-ground installations - that are necessary for the transport and distribution of water and energy. From pipelines and cables for the transport of oil, gas, water and electricity to widespread distribution networks that bring these facilities to the end user. 

  • news

    Outstanding result in KSA Outstanding result in KSA

    Outstanding result in KSA

    The Khurais Seawater Pipeline Project has been successfully completed. In a written statement, client Saudi Aramco characterizes our contribution to the project as outstanding.

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.

  • news

    Digital collaboration with grid operators Digital collaboration with grid operators

    Digital collaboration with grid operators

    A.Hak's IT/IM department and client Alliander contributed significantly to the development of the Digital Collaborative Platform.

  • news

    One million man hours without LTIs One million man hours without LTIs

    One million man hours without LTIs

    A.Hak is working on the construction of a pipeline for Saudi Aramco in the Kingdom of Saudi-Arabia. This week the million man hour mark was reached without a single LTI (lost time incident).